Marex NDT L.L.C-FZ · Dubai, United Arab Emirates[email protected]
English
Aerial view of a data center rooftop cooling plant, pipe racks, walkways and perimeter waterproofing
Sectors · Critical buildings worldwide

Your uptime starts at the roof.

Independent waterproofing coating inspection for data centers, from the first drawing to year 10. Above every white space sits a roof with no redundancy.

Illustrative aerial view: data center rooftop plant (Rsparks3, CC0, Wikimedia Commons)

USD 300k+/hrDowntime cost for over 90% of mid-size and large enterprises (ITIC 2024)
100% testedElectronic leak detection (ASTM D7877) before chillers arrive
4 phasesDesign, construction, hybrid operation, warranty years 1 to 10
2-minute readSigned executive report, priority map, year-on-year record
Aerial view of a data center campus with ranks of flat roofs, substations and rooftop plant
Roofs measured in hectares. A data center campus is a field of single-layer waterproofing envelopes over live halls.Theodore Christopher, CC0, Wikimedia Commons

Three questions operators ask us

  • The roof above the hallSince handover, who has independently tested, inspected and recorded the condition of the roof above your white space, and where is that record today?
  • A leak before an outageCan a defect at a drain, a penetration or a chiller plinth be found and closed before water reaches the power chain?
  • A signed independent reportIf something fails, who can produce a dated, mapped and signed report that an owner, an insurer and a contractor can all rely on?

Independent by design. MAREX is an independent inspection firm specialised in waterproofing coatings on critical buildings: data centers, hospitals and other sensitive facilities, working worldwide. It does not sell, apply or install roofing, and holds no distributorship or agreement with any coating manufacturer.

Risk

Your servers have N+1. Your roof has no backup.

A data center is designed so that no single failure stops it: redundant power paths, N+1 or 2N cooling, concurrently maintainable systems. The waterproofing membrane is the one layer with no redundancy, and it sits directly above everything you protect.

Once chillers, pipe racks, cable trays and walkways are installed, large parts of the roof can no longer be tested, or repaired without moving plant. A pinhole found before equipment arrives costs a patch. Found after handover, it can cost a crane, a shutdown window and a dispute. Every assignment follows the MAREX Integrity Process, from desk study to a signed inspection report.

We speak data center

  • White spaceThe hall where IT racks run.
  • N+1 and 2NSpare capacity so one failure does not stop service.
  • Tier III and Tier IVUptime Institute levels: concurrently maintainable, fault tolerant.
  • ANSI/TIA-942Telecommunications infrastructure standard for data centers.
  • CRAH and chillersAir handlers in the hall; chillers and dry coolers on the roof.
  • SLAThe availability promised to clients, with penalties.
Roof anatomy & singular points

Where leaks start: seven critical interfaces above the hall

Failure rarely begins in the middle of an open membrane field. It starts at details: upstands, parapets, penetrations, drains, HVAC bases, cable trays and expansion joints, above CRAH units, server racks and UPS rooms.

Data center roof cross-section and seven singular points above white space Annotated diagram showing upstands, parapets, penetrations, roof drains, HVAC equipment bases, cable trays, and expansion joints above the single waterproofing membrane protecting the CRAH hall, white space server racks, and UPS battery room. ROOF PLANT & WATERPROOFING ENVELOPE (NO N+1 BACKUP) Thermal & UV load Chiller / dry cooler Chilled-water pipe Cable tray & sleepers Drain & overflow Expansion joint Plant plinth WATERPROOFING MEMBRANE + STRUCTURAL DECK (ONE LAYER, ZERO REDUNDANCY) Water ingress path CRAH HALL Air handlers (N+1) WHITE SPACE · IT SERVER RACKS (N+1 / 2N) UPS & BATTERY ROOM Transfer switches & power chain UPS STS BATT 1 2 3 4 5 6 7 1 Upstands · 2 Parapets · 3 Penetrations · 4 Drains & overflows · 5 HVAC bases & supports · 6 Cable trays · 7 Expansion joints Schematic: MAREX
Generic cross-section showing why a roof defect does not stay a roof problem: water entering at a penetration, support or blocked drain reaches the electrical and cooling chain below. Actual roof build-ups vary by specification.
Dense field of rooftop chillers with steel service walkways and pipe racks over a flat waterproofing membrane
In reality, hundreds of them per roof. Every chiller, walkway and pipe rack is another support or path across the membrane.Rsparks3, CC0, Wikimedia Commons
Ducts, pipe runs and packaged cooling units crossing a data center roof membrane beside a dense chiller deck
Penetrations and upstands. Ducts and pipe runs cross the membrane and multiply the details where leaks start.Rsparks3, CC0, Wikimedia Commons
01 · UPSTANDS

Upstands & flashings

Vertical terminations around curbs, hatches and plinths. Checked for bond, height, termination bars and topcoat continuity.

02 · PARAPETS

Parapets & copings

Roof perimeter edges exposed to thermal movement and wind uplift. Sealant splits at coping joints are a primary perimeter leak path.

03 · PENETRATIONS

Pipes, conduits & entries

Chilled-water pipes and late-added conduits cut through the membrane. Every unlogged or unsealed penetration threatens the hall below.

04 · DRAINS

Drains & overflows

Sand, gravel or hail blocks outlets. Ponding loads the deck and tests every weak detail until water enters.

05 · HVAC BASES

Equipment supports

Chiller and dry-cooler plinths carry heavy loads and vibration, hiding the membrane underneath once plant is craned in.

06 · CABLE TRAYS

Cable trays & walkways

Sleepers, pedestals and post-handover cabling routes where technicians walk and drop fasteners onto unprotected waterproofing.

07 · JOINTS

Expansion joints

Structural movement joints absorbing large day-night thermal swings. Inspected for bellows integrity, tie-in overlaps and sealant fatigue.

RECORD

Penetration register

Every post-handover support or cable entry is logged, inspected and sealed by an approved applicator to keep warranties intact.

Business impact

The cost of downtime, and real water-ingress incidents

Survey figures below cover all outage causes and show the financial scale of an hour offline, not the cost of a roof leak in isolation. Documented incidents below show how water, once inside, turns into a power event.

USD 300,000+

One hour of downtime

Cost of one hour offline for over 90% of mid-size and large enterprises. 41% put it at USD 1 million to over USD 5 million per hour.

ITIC, 2024 Hourly Cost of Downtime Survey (1,000+ firms worldwide), itic-corp.com.

57%

Major outage above USD 100k

Share of operators reporting their most recent major outage cost over USD 100,000; 1 in 5 report more than USD 1 million.

Uptime Institute, Annual Outage Analysis 2026, uptimeinstitute.com. Power remains the leading cause of impactful outages.

USD 8,851

Per minute on average

Average unplanned outage cost per minute, or USD 740,357 per incident across 63 studied US data centers.

Ponemon Institute, Cost of Data Center Outages, January 2016, ponemon.org.

6 March 2010 · MelbourneOutage: 45 min to 12 h

Datacom co-location: blocked roof drains short-circuit power

Heavy rain and hail blocked roof gutters and drains. Water entered through the roof onto customer racks and, about an hour later, short-circuited an automatic static transfer switch. Hosted links experienced outages from roughly 45 minutes to 12 hours.

Lesson: drains and overflows are part of the waterproofing. Order of magnitude at ITIC USD 300k/h: up to USD 3.6M for 12 h (cost not published). Sources: iTnews, 8 & 13 March 2010, itnews.com.au.

26 April 2023 · ParisOutage: 24 h+ region, 2+ weeks zone

Global Switch / Google Cloud: water in the battery room

A cooling-system water leak reached the battery room and a fire followed. Google Cloud reported water intrusion in europe-west9, causing a multi-cluster failure and zone shutdowns affecting public and enterprise services.

Lesson: water plus electrical rooms is the worst combination. Above UPS and battery rooms, plant decks and penetrations warrant 100% leak testing at handover and recurring checks (cost not published; press reports).

Inspection programme

Four phases from the first drawing to year 10

Most roof failures are decided on two days: the day details are drawn and the day they are applied. Most roof disputes are decided years later, on the strength of the records. MAREX delivers one continuous baseline, one data set and one independent signature.

Hyperscale data center hall with packed mechanical plant along the building and a continuous rooftop membrane
Service continuity at stake. Packed plant along a hyperscale hall leaves little room to inspect, or to repair, without a planned window.Chad Davis, CC BY 2.0, Wikimedia Commons
Delivered within the construction package Operations & warranty programme, contracted directly with MAREX 1 · DESIGN Design consultant Before tender 2 · CONSTRUCTION Quality controller Application to handover 3 · OPERATION Hybrid inspection programme Twice yearly & after storms (FM Global DS 1-32) 4 · WARRANTY & INCIDENTS Technical expert DLP audit, Year 9 decennial audit, leak root cause Handover Year 1 End-of-DLP audit Annual baseline Year 9 audit Year 10
Phase & MAREX role When & contract What MAREX checks & tests What the client receives
Phase 1 · Design
Design consultant
Before tender
Construction package
Movement joints, upstands, parapets, drains and overflows; equipment plinths standardised; sequence allowing 100% electronic leak detection before chillers arrive; wind uplift and fire checks against FM Global data sheets, FM Approvals, ASTM E108 / UL 790. Design review & draft ITPDrawing-pinned comment register, ranked envelope risk list, and the draft Inspection and Test Plan for construction.
Phase 2 · Construction
Quality controller
Application to handover
Construction package
Mandatory hold points: batch traceability, substrate moisture and pull-off adhesion (ASTM D4541), ambient conditions log, wet/dry film thickness by zone, and 100% electronic leak detection (ASTM D7877) prior to plant placement. Handover baseline dossierLeak-test maps, thickness and adhesion logs by zone, timestamped photos, closed non-conformities and signed acceptance.
Phase 3 · Operation
Hybrid inspector
Twice yearly & post-storm
Direct with MAREX
Aligned with FM Global Data Sheet 1-32. Consistent annual aerial/thermal route (ASTM C1153) followed by on-foot inspection and contact confirmation at every drain, parapet, upstand, penetration and plant base. 2-minute executive reportPrioritised P1/P2/P3 action list, geolocated observation map, contact-verified sheets and year-on-year trend tracking.
Phase 4 · Warranty
Technical expert
Years 1 to 10 & incidents
Direct with MAREX
End-of-defects-liability audit (year 1 to 2), Year 9 decennial audit, ongoing penetration register and drain log to preserve manufacturer warranties, plus rapid cut/adhesion testing after leaks or storms. Warranty file & root causeInsurer-ready pre-loss baseline, contractor quote brief, repair sign-off on the same IDs, or root-cause allocation report.
The deliverable · Centrepiece

The MAREX report: read page one in two minutes and decide

The inspection is only as useful as the report it produces. Instead of an unindexed folder of photos, page one gives your facility director, insurer and contractors a clear condition verdict, ranked priorities and a permanent year-on-year record.

Illustrative exampleFictitious site and data, for layout only. Not a MAREX project and not a real inspection.

MAREX inspection report · RPT-B-2026-03 · Page 1 of 18

Example Campus · Hall B roof (approx. 10,000 m²)

Annual inspection · 12 March 2026
Hybrid: 2 inspectors on foot + aerial IR · Signed by lead inspector
14
Observations
2
To treat
5
To monitor
7
Sound
Executive summary: Overall condition is sound, with two actions before the storm season. No water was found in the white space. Debris blocks the outlet at Drain 3 with confirmed wet insulation beneath; a cable entry at Chiller plinth 7 is unsealed. Both sit above the chilled-water and power routes of Hall B. Five items are stable to monitor; seven are sound.
PriorityLocationFinding and recommended actionTarget dueClass
P1Drain 3 · grid F/3Outlet blocked, wet zone around collar confirmed by contact check. Clear outlet, fit guard, cut and replace wet zone.Before 30 AprTo treat
P2Chiller plinth 7 · B/4Unsealed post-handover cable entry. Seal via approved applicator and log in penetration register.This monthTo treat
P3West parapet · A/2-4Hairline split in coping sealant, no moisture detected. Re-check at next scheduled visit.Next visitTo monitor
Geolocated roof plan · Report page 3 Hall B roof plan · approx. 10,000 m² · illustrative, not a real site ABCD EFGH 123 456 Chiller 1 Chiller 2 Chiller 3 Chiller 4 Chiller 5 Plinth 7 Plinth 8 Plinth 9 Plinth 10 Plinth 11 Chilled-water pipe rack Walkway pavers Roof hatch IR anomaly, wet confirmed by contact check D3 C7 PW S4 P9 K2 D1 U12 C2 N 010 2030 m Sound To monitor To treat Grid refs to drawing; each pin GPS-tagged on site
Decision for the director
Approve this monthP1 and P2: two bounded work orders, one approved applicator.
Hold to next visitP3 and four other monitored items.
No work requiredSeven sound observations.
After the worksFollow-up check closes P1 and P2 on the same IDs.
Observation sheet · D3 To treat
Flat roof rainwater drain outlet surrounded by gravel ballast, illustrative observation photo
Grid: F/3 · GPS-tagged
Method: Visual, IR scan, contact check
History: Y1 sound, Y2 monitor, Y3 treat
Risk: Ponding above Hall B power route
Close-out: Photo + re-test on ID D3

Photo: Asurnipal, CC BY-SA 4.0 (Wikimedia Commons), illustrative observation image only.

Year-on-year evolution tracking · Report page 15
IDLocationY1Y2Y3Trend
D3Drain 3, F/3SoundMonitorTreatWorsening: act now
C7Plinth 7, B/4New Y2MonitorTreatOpened by new cabling
PWWest parapetMonitorMonitorMonitorStable
S4Pipe support 4SoundSoundMonitorSealant ageing
U12Upstand 12MonitorTreatSoundRepaired & closed
Whole roof by class (Y1 to Y3) Year 1 10 3 13 obs. Year 2 8 5 1 14 obs. Year 3 7 5 2 14 obs. Teal: sound · Amber: to monitor · Red: to treat
DatedSame-angle photos each year place every defect in time.
LocatedGrid reference and GPS tag let contractors find the exact point alone.
ComparableSame IDs track deterioration and close-out repairs cleanly.
SignedLead inspector sign-off accepted by insurers and manufacturers.
Field approach

Inspectors on the roof. Tools where they earn their place.

MAREX does not sell drone flights. MAREX sells an inspection programme built for the most decision-ready verdict with the least disruption and spend.

Competent inspectors go on foot where judgement is required; aerial and thermal tools cover wide open surfaces without scaffolding or unnecessary shutdowns. A photograph, even an infrared one, does not lift a flashing, probe a sealant or clear a blocked outlet. That work is carried out on the roof by an inspector who can be questioned and who signs the file.

STEP A

Plan with operations

Confirm roof access, security permits, plant clearances and priority drains, parapets and penetrations.

STEP B

Repeatable aerial & IR route

A tool, not the service. Flown along the same path and settings each year so the roof is compared with itself.

STEP C

On-foot contact verification

Infrared anomalies (ASTM C1153) are confirmed by physical contact checks; every detail is inspected at hand level.

STEP D

Signed report & close-out

Actionable findings issued to your team; repairs are re-checked and signed off on the same observation IDs.

Illustrative visual: a MAREX inspector in red coverall with white piping and yellow-green helmet with MAREX logo recording roof data
Illustrative visual. MAREX inspector recording findings directly into the site baseline file.

Related services

Starting point

For a project in design or construction, the usual first step is a Design and Specification Review.

For a live facility, it is a Baseline Roof Inspection and Report establishing your dated condition record across every hall and plant zone.

Planning an inspection programme or a tender?

Send us your scope, drawings and timeline. We return a structured technical and commercial proposal.

Talk to an inspector today