Your uptime starts at the roof.
Independent waterproofing coating inspection for data centers, from the first drawing to year 10. Above every white space sits a roof with no redundancy.
Illustrative aerial view: data center rooftop plant (Rsparks3, CC0, Wikimedia Commons)
Three questions operators ask us
- The roof above the hallSince handover, who has independently tested, inspected and recorded the condition of the roof above your white space, and where is that record today?
- A leak before an outageCan a defect at a drain, a penetration or a chiller plinth be found and closed before water reaches the power chain?
- A signed independent reportIf something fails, who can produce a dated, mapped and signed report that an owner, an insurer and a contractor can all rely on?
Independent by design. MAREX is an independent inspection firm specialised in waterproofing coatings on critical buildings: data centers, hospitals and other sensitive facilities, working worldwide. It does not sell, apply or install roofing, and holds no distributorship or agreement with any coating manufacturer.
Your servers have N+1. Your roof has no backup.
A data center is designed so that no single failure stops it: redundant power paths, N+1 or 2N cooling, concurrently maintainable systems. The waterproofing membrane is the one layer with no redundancy, and it sits directly above everything you protect.
Once chillers, pipe racks, cable trays and walkways are installed, large parts of the roof can no longer be tested, or repaired without moving plant. A pinhole found before equipment arrives costs a patch. Found after handover, it can cost a crane, a shutdown window and a dispute. Every assignment follows the MAREX Integrity Process, from desk study to a signed inspection report.
We speak data center
- White spaceThe hall where IT racks run.
- N+1 and 2NSpare capacity so one failure does not stop service.
- Tier III and Tier IVUptime Institute levels: concurrently maintainable, fault tolerant.
- ANSI/TIA-942Telecommunications infrastructure standard for data centers.
- CRAH and chillersAir handlers in the hall; chillers and dry coolers on the roof.
- SLAThe availability promised to clients, with penalties.
Where leaks start: seven critical interfaces above the hall
Failure rarely begins in the middle of an open membrane field. It starts at details: upstands, parapets, penetrations, drains, HVAC bases, cable trays and expansion joints, above CRAH units, server racks and UPS rooms.
Upstands & flashings
Vertical terminations around curbs, hatches and plinths. Checked for bond, height, termination bars and topcoat continuity.
Parapets & copings
Roof perimeter edges exposed to thermal movement and wind uplift. Sealant splits at coping joints are a primary perimeter leak path.
Pipes, conduits & entries
Chilled-water pipes and late-added conduits cut through the membrane. Every unlogged or unsealed penetration threatens the hall below.
Drains & overflows
Sand, gravel or hail blocks outlets. Ponding loads the deck and tests every weak detail until water enters.
Equipment supports
Chiller and dry-cooler plinths carry heavy loads and vibration, hiding the membrane underneath once plant is craned in.
Cable trays & walkways
Sleepers, pedestals and post-handover cabling routes where technicians walk and drop fasteners onto unprotected waterproofing.
Expansion joints
Structural movement joints absorbing large day-night thermal swings. Inspected for bellows integrity, tie-in overlaps and sealant fatigue.
Penetration register
Every post-handover support or cable entry is logged, inspected and sealed by an approved applicator to keep warranties intact.
The cost of downtime, and real water-ingress incidents
Survey figures below cover all outage causes and show the financial scale of an hour offline, not the cost of a roof leak in isolation. Documented incidents below show how water, once inside, turns into a power event.
One hour of downtime
Cost of one hour offline for over 90% of mid-size and large enterprises. 41% put it at USD 1 million to over USD 5 million per hour.
ITIC, 2024 Hourly Cost of Downtime Survey (1,000+ firms worldwide), itic-corp.com.
Major outage above USD 100k
Share of operators reporting their most recent major outage cost over USD 100,000; 1 in 5 report more than USD 1 million.
Uptime Institute, Annual Outage Analysis 2026, uptimeinstitute.com. Power remains the leading cause of impactful outages.
Per minute on average
Average unplanned outage cost per minute, or USD 740,357 per incident across 63 studied US data centers.
Ponemon Institute, Cost of Data Center Outages, January 2016, ponemon.org.
Datacom co-location: blocked roof drains short-circuit power
Heavy rain and hail blocked roof gutters and drains. Water entered through the roof onto customer racks and, about an hour later, short-circuited an automatic static transfer switch. Hosted links experienced outages from roughly 45 minutes to 12 hours.
Lesson: drains and overflows are part of the waterproofing. Order of magnitude at ITIC USD 300k/h: up to USD 3.6M for 12 h (cost not published). Sources: iTnews, 8 & 13 March 2010, itnews.com.au.
Global Switch / Google Cloud: water in the battery room
A cooling-system water leak reached the battery room and a fire followed. Google Cloud reported water intrusion in europe-west9, causing a multi-cluster failure and zone shutdowns affecting public and enterprise services.
Lesson: water plus electrical rooms is the worst combination. Above UPS and battery rooms, plant decks and penetrations warrant 100% leak testing at handover and recurring checks (cost not published; press reports).
Four phases from the first drawing to year 10
Most roof failures are decided on two days: the day details are drawn and the day they are applied. Most roof disputes are decided years later, on the strength of the records. MAREX delivers one continuous baseline, one data set and one independent signature.
| Phase & MAREX role | When & contract | What MAREX checks & tests | What the client receives |
|---|---|---|---|
| Phase 1 · Design Design consultant |
Before tender Construction package |
Movement joints, upstands, parapets, drains and overflows; equipment plinths standardised; sequence allowing 100% electronic leak detection before chillers arrive; wind uplift and fire checks against FM Global data sheets, FM Approvals, ASTM E108 / UL 790. | Design review & draft ITPDrawing-pinned comment register, ranked envelope risk list, and the draft Inspection and Test Plan for construction. |
| Phase 2 · Construction Quality controller |
Application to handover Construction package |
Mandatory hold points: batch traceability, substrate moisture and pull-off adhesion (ASTM D4541), ambient conditions log, wet/dry film thickness by zone, and 100% electronic leak detection (ASTM D7877) prior to plant placement. | Handover baseline dossierLeak-test maps, thickness and adhesion logs by zone, timestamped photos, closed non-conformities and signed acceptance. |
| Phase 3 · Operation Hybrid inspector |
Twice yearly & post-storm Direct with MAREX |
Aligned with FM Global Data Sheet 1-32. Consistent annual aerial/thermal route (ASTM C1153) followed by on-foot inspection and contact confirmation at every drain, parapet, upstand, penetration and plant base. | 2-minute executive reportPrioritised P1/P2/P3 action list, geolocated observation map, contact-verified sheets and year-on-year trend tracking. |
| Phase 4 · Warranty Technical expert |
Years 1 to 10 & incidents Direct with MAREX |
End-of-defects-liability audit (year 1 to 2), Year 9 decennial audit, ongoing penetration register and drain log to preserve manufacturer warranties, plus rapid cut/adhesion testing after leaks or storms. | Warranty file & root causeInsurer-ready pre-loss baseline, contractor quote brief, repair sign-off on the same IDs, or root-cause allocation report. |
The MAREX report: read page one in two minutes and decide
The inspection is only as useful as the report it produces. Instead of an unindexed folder of photos, page one gives your facility director, insurer and contractors a clear condition verdict, ranked priorities and a permanent year-on-year record.
Fictitious site and data, for layout only. Not a MAREX project and not a real inspection.
Example Campus · Hall B roof (approx. 10,000 m²)
| Priority | Location | Finding and recommended action | Target due | Class |
|---|---|---|---|---|
| P1 | Drain 3 · grid F/3 | Outlet blocked, wet zone around collar confirmed by contact check. Clear outlet, fit guard, cut and replace wet zone. | Before 30 Apr | To treat |
| P2 | Chiller plinth 7 · B/4 | Unsealed post-handover cable entry. Seal via approved applicator and log in penetration register. | This month | To treat |
| P3 | West parapet · A/2-4 | Hairline split in coping sealant, no moisture detected. Re-check at next scheduled visit. | Next visit | To monitor |
| Approve this month | P1 and P2: two bounded work orders, one approved applicator. |
| Hold to next visit | P3 and four other monitored items. |
| No work required | Seven sound observations. |
| After the works | Follow-up check closes P1 and P2 on the same IDs. |
Photo: Asurnipal, CC BY-SA 4.0 (Wikimedia Commons), illustrative observation image only.
| ID | Location | Y1 | Y2 | Y3 | Trend |
|---|---|---|---|---|---|
| D3 | Drain 3, F/3 | Sound | Monitor | Treat | Worsening: act now |
| C7 | Plinth 7, B/4 | New Y2 | Monitor | Treat | Opened by new cabling |
| PW | West parapet | Monitor | Monitor | Monitor | Stable |
| S4 | Pipe support 4 | Sound | Sound | Monitor | Sealant ageing |
| U12 | Upstand 12 | Monitor | Treat | Sound | Repaired & closed |
Inspectors on the roof. Tools where they earn their place.
MAREX does not sell drone flights. MAREX sells an inspection programme built for the most decision-ready verdict with the least disruption and spend.
Competent inspectors go on foot where judgement is required; aerial and thermal tools cover wide open surfaces without scaffolding or unnecessary shutdowns. A photograph, even an infrared one, does not lift a flashing, probe a sealant or clear a blocked outlet. That work is carried out on the roof by an inspector who can be questioned and who signs the file.
Plan with operations
Confirm roof access, security permits, plant clearances and priority drains, parapets and penetrations.
Repeatable aerial & IR route
A tool, not the service. Flown along the same path and settings each year so the roof is compared with itself.
On-foot contact verification
Infrared anomalies (ASTM C1153) are confirmed by physical contact checks; every detail is inspected at hand level.
Signed report & close-out
Actionable findings issued to your team; repairs are re-checked and signed off on the same observation IDs.
Related services
For a project in design or construction, the usual first step is a Design and Specification Review.
For a live facility, it is a Baseline Roof Inspection and Report establishing your dated condition record across every hall and plant zone.
Related reading and the next step
A coating is a system
Why singular points, overlaps and the substrate decide whether a membrane holds.
Read the note → SpecialityWaterproofing coatings inspection
Polyurea and bituminous systems: adhesion, continuity, moisture and singular points.
View the service → Next stepRequest a proposal
Send the scope, drawings and timeline. We respond within 24 hours.
Request a proposal →Planning an inspection programme or a tender?
Send us your scope, drawings and timeline. We return a structured technical and commercial proposal.